Blow the residual dust out of the concrete hole using a vacuum or syringe blower.
Fixing wood flooring to concrete.
Sand the boards step 5.
I have my doubts on this and would like to figure out what the expectation for a 5.
Gluing solid parquet flooring directly to a concrete slab solid parquet hardwood flooring can be glued directly to a concrete slab on grade or above grade with the use of a manufacturer recommended vapor retarder.
Nail boards into place step 4.
That s the way h w floors are.
Drill completely through the wood and about 1 4 inch 0 64 cm deeper than the screw s length into the concrete.
After 3 attempts and 5 months to fix numerous creaks in the floor the installer is now claiming.
Always use a moisture bearer which is usually placed between the subfloor and the finished floor.
Put vapor barrier in place step 3.
Fortunately there are many ways to make the transition from concrete floors and wall frames to wood floors and drywall.
Remove damaged pieces of flooring step 2.
How to repair hardwood flooring step 1.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Concrete is not the easiest material to work with especially if you re trying to build a structure like a house that involves the use of both concrete and wood products.
Concrete must be a minimum of 30 days old.
We had a h w floor installed by the builder on concrete slab.
The surface of the concrete must be flat and free of oil grease and dust.
Mark the holes in the concrete and wood using a permanent marker first to make sure your holes are precise.
Sign up now for tim s free weekly newsletter at.
Clean the concrete surface and apply a thinset compound to all of the low areas until the surface of the concrete pad is smooth and level.