Figure 8 fiber optic cable installation is fast easy and economical for outdoor applications including building to building and other aerial applications.
Figure 8 fibre optic cable.
Outer sheath is made of uv resistance pe jacket.
Shenzhen kaishengda cable co ltd.
Description corning altos figure 8 gel free cables are self supporting aerial cables designed for easy and economical one step installation.
Because they come complete with messengers these cables don t require the purchase or installation of a messenger and the attachment of the cable to the messenger.
A figure 8 fiber optic cable can save you money on the materials you purchase as well as on install time.
Figure 8 water blocking armored fiber optic cable gytc8s53 the fibers are placed in a loose tube made of high modulus plastic.
These gel free cables feature easy one step installation and require no messy cleanup.
These cables are not suitable for deployment near high voltage power lines.
The corrugated steel tape is applied which provide for crush resistant.
It incorporates both a steel messenger and the core of a standard optical fiber cable into a single jacket of figure 8 cross section.
Sterlite figure 8 self supporting optical fiber cable greatly simplifies the task of placing fiber optic cable on an aerial plant.
The loose tube are made of high modulus plastics pbt which are filled with water resistant gel.
Wirelink splices can be used to splice together the messenger at mid point locations for continuity purposes.
The loose tube design provides stable performance over a wide temperature range and is compatible with any telecommunicatio ns grade optical fiber.
The tubes are filled with a water resistant filling compound.
Prysmian s figure 8 fiber optic drop cable is designed for use with standard wirevise service drop wire clamps in aerial applications.
A frp locates in the center of core as a metallic strength member.
Altos figure 8 unique design with fiber counts from 12 to 288 fibers featuring a steel messenger for quick easy one step installation on pole and building infrastructure in short spans.